NWI ELF/EMF Occupational Health Baseline

Industrial Corridor Assessment โ€” Hammond, Whiting, East Chicago

โšก The Problem

The West Lake Corridor (Monon Line) opened March 31, 2026, introducing electrified rail through one of the most concentrated industrial corridors in the United States.

8.3 mi
Electrified rail
25 kV
Overhead catenary
15,000+
Workers in corridor
0
Baseline EMF studies

No baseline data exists on occupational ELF/EMF exposure in this corridor โ€” before or after electrified rail activation.

๐Ÿญ The Industrial Corridor

The Hammond-Whiting-East Chicago corridor contains some of the largest industrial facilities in the Midwest:

EmployerLocationWorkersIndustry
BP Whiting RefineryWhiting~3,500Petroleum
Cleveland-Cliffs Burns HarborBurns Harbor~3,000Steel
Cleveland-Cliffs Indiana HarborEast Chicago~4,000Steel
UnileverHammond~500Food Mfg
Dover ChemicalHammond~300Chemicals
CargillHammond~100Grain

These facilities already have significant electrical infrastructure. The new electrified rail adds another layer of ELF/EMF exposure.

๐Ÿ“Š Our Framework

We're not claiming EMF causes disease. We're establishing baseline data so that if concerns arise later, there's something to compare against.

This is the same logic as:

Key distinction: We're measuring exposure, not asserting harm.

๐Ÿ”ฌ The Science

What We Know

FindingSource
WHO/IARC classifies ELF magnetic fields as Group 2B (possibly carcinogenic) IARC Monographs Vol. 80 (2002)
Childhood leukemia OR 1.72 at โ‰ฅ0.4 ยตT exposure PLOS ONE 2021 meta-analysis
Occupational burnout/depression linked to ELF-EMF Hosseinabadi et al. 2020
Systematic review confirms occupational health impacts Jafari et al. 2025

What We DON'T Claim

๐Ÿ“ Methodology

What We'll Measure

Study Design

๐ŸŽฏ Benefits

For the Region

  • First baseline dataset
  • Leadership in occupational health
  • Replicable model

For Industry

  • Due diligence documentation
  • Proactive risk management
  • Worker safety leadership

For Workers

  • Transparency
  • Informed consent
  • Long-term monitoring foundation

๐Ÿค The Ask

We're asking SBDC for a letter of support โ€” not funding.

This letter would:

Timeline

PhaseTimelineFunding
SBDC Support LetterMay 2026$0
Purdue RF Alliance InquiryJune 2026Equipment access
SBIR Phase I ApplicationAug 2026$323,090
Pilot ExecutionQ1โ€“Q2 2027SBIR funds

๐Ÿ‘ค About Anthrocybernetics

Anthrocybernetics is a research office based at the Purdue Tech Center in Crown Point, Indiana, focused on:

We've developed EMF sensing technology capable of measuring time-varying magnetic fields with high precision โ€” the core instrumentation for this pilot.